Purchase
Hire
We don't send anything by standard post, all of our deliveries are by trusted couriers which are fully traceable to ensure your orders arrive safe and on time.
Delivery costs can be found at checkout.
EXPRESS DELIVERY - Next Working Day Courier, delivered between 08:30-17:00
Scottish Delivery: 1-2 Day Courier (after dispatch)
UK Before 10:30AM: (please call first to check availability)
UK Express Saturday Delivery: (please call first to check availability)
Click & Collect: Free!
Channel Islands: 1-3 Day Courier (Jersey, Guernsey and Isle of Man)
Western Europe: (Netherlands, France, Belgium, Spain, Portugal)
Eastern Europe: Find out in checkout
Rest of the world: Find out in checkout
NOTE: During Black Friday Week delivery might take a little longer due to the increased demand of our Black Friday sale. We thank you for your patience and we'll do our very best to get you your items as soon as we can.
Please be aware that some of our products have a lead time, and therefore the quoted transit times above are only applicable after the goods have been dispatched. We always make it clear in the description if our products have a lead time.
We regret that we cannot provide time slots for deliveries unless you have selected pre 10:30AM delivery, all standard express deliveries are delivered between 08:30-17:00 the next working day from dispatch.
Collection of most goods can be made from our warehouse upon request. Did you know that we have a range of slings, shackles and hoists available for instant Click & Collect? While nearly all items on our website can be collected next working day! Call our sales team now on 01384567430
Scaffolding runway systems are ideal for suspending hoists to lift and transport loads up to 1600kg easily and safely. Each kit is modular, extendable and can also be supplied with a standard trolley with an eye, trolley with rotating eye or for the largest model- a double trolley with a fixed eye.
Perfect for suspending electric or manual chain hoists on site and getting heavy loads to the top of any scaffolding structure.
Further offline optional extras:
A super advantage of the Scaffold Runway System is that you can constantly re-configure the system due to its modular design to achieve a longer or shorter system with the addition or subtraction of additional components which are available from LES. The standard piece length is 1m, but we can offer special lengths upon your request.
Model | SWL | Track Support Centres | Point Loading @ Supports* | Max. Cantilever |
24.000 | 125kg | 1m | 163kg | 0.35m |
25.000 | 250kg | 1.5m | 326kg | 0.4m |
26.000 | 500kg | 1.5m | 637kg | 0.5m |
27.000 | 1,000kg | 1.5m | 1294kg | 0.5m |
27.000 | 1,600kg | 1m | 2062kg | 0.3m |
* This does not include the weight of the hoist and any lifting accessories that may be suspended from the load trolleys.